Službeni sažetak · English
Što se nabavlja?
The Shield Building is the structure and annulus area that surrounds the containment building and is located in the Nuclear Island (NI). The Shield Building uses concrete-filled steel plate construction (SC) as well as reinforced concrete sections. The SC40 Shield Building SC Wall Panels scope reflects the cylindrical portion of the concrete-filled steel plate construction for the Shield Building. The Shield Building cylindrical wall has an outside radius of 22.1 m and a thickness of 0.91 m. For each one (1) unit, there are 167 individually fabricated/shipped SC40 panels. There are four main types of panels, which are further arranged into 56 unique panel “groups” that each represent a unique panel configuration. The panels are steel composite construction with 19.1 mm to 25.4 mm thick rol
Strojni prijevod za lakše razumijevanje. Službeni sažetak ostaje mjerodavan.
Službeni sažetak · English
The Shield Building is the structure and annulus area that surrounds the containment building and is located in the Nuclear Island (NI). The Shield Building uses concrete-filled steel plate construction (SC) as well as reinforced concrete sections. The SC40 Shield Building SC Wall Panels scope reflects the cylindrical portion of the concrete-filled steel plate construction for the Shield Building. The Shield Building cylindrical wall has an outside radius of 22.1 m and a thickness of 0.91 m. For each one (1) unit, there are 167 individually fabricated/shipped SC40 panels. There are four main types of panels, which are further arranged into 56 unique panel “groups” that each represent a unique panel configuration. The panels are steel composite construction with 19.1 mm to 25.4 mm thick rol
Besplatno
Primajte nove natječaje iz ove djelatnosti
Svaki tjedan primajte e-poštu s novim objavama koje odgovaraju vašim kriterijima. Prije aktivacije besplatne obavijesti provjerite ili prilagodite kriterije.
Popis za pripremu
Pripremi moju ponudu
Točke za provjeru u službenoj dokumentaciji. Ovaj vodič nije automatska analiza dokumentacije.
- Pročitati sve dokumente i izmjene
- Provjeriti uvjete sudjelovanja i tražene dokumente
- Provjeriti je li potreban obilazak ili sastanak
- Pregledati kriterije dodjele i njihove pondere
- Provjeriti raspoložive resurse, proračun i raspored
- Potvrditi postupak i rok predaje
TED · 651178-2026. Provjereno 22. ruj 2026. 11:05.
https://ted.europa.eu/en/notice/-/detail/651178-2026
Analiziraj ovu objavu uz AI
Saznajte najvažnije: sažetak, rokove i točke za provjeru na temelju dostupnih informacija.
Analize objava i PDF-ova koriste istu kvotu.
Povijest obavijesti
Vremenski slijed postupka nabave
Pratite glavne faze i izmjene povezane s ovim postupkom nabave.
Podaci su preuređeni radi lakšeg čitanja. Službena obavijest i dokumentacija uvijek imaju prednost.
Izvor i pouzdanost
TED · 651178-2026. Provjereno 22. ruj 2026. 11:05.
Podaci su preuređeni radi lakšeg čitanja. Službena obavijest i dokumentacija uvijek imaju prednost.