Official summary
What is being procured?
Dublin City Council (DCC) is leading the development of the Dublin District Heating Project (DDHP) which aims to capture waste heat from industrial facilities on the Poolbeg Peninsula, and pipe it into homes, businesses and civic buildings in the Poolbeg, Ringsend and Docklands areas of Dublin city via a pipeline network. The primary heat source for the project will be the Dublin Waste to Energy (DWtE) facility at Poolbeg. The DDHP requires the installation of underground, highly insulated District Heating pipes. Site investigations are required to assess ground conditions along the proposed route which will inform detailed design. The total extent of the project as described in the site location map provided, has an approximate length of 6.6km. This site investigation works will be divide
Preparation checklist
Prepare my response
Checks to carry out in the official documents. This guide is not an automated document analysis.
- Read the complete documents and amendments
- Check participation conditions and required documents
- Check whether a site visit or meeting is required
- Review award criteria and their weighting
- Check available resources, budget and schedule
- Confirm the submission process and deadline
TED · 636107-2026. Checked on Sep 16, 2026, 11:05 AM.
https://ted.europa.eu/en/notice/-/detail/636107-2026
Analyse this notice with AI
Summary, requirements and deadlines based on the information in this notice. The tender documents are not read.
Sign in to analyseNotice and PDF analyses use the same allowance.
Notice history
Procurement timeline
Follow the main stages and updates linked to this procurement procedure.
No other related notice has been identified yet.
Data is restructured for easier reading. The official notice and procurement documents always prevail.
Source and reliability
TED · 636107-2026. Checked on Sep 16, 2026, 11:05 AM.
Data is restructured for easier reading. The official notice and procurement documents always prevail.