What is being procured?
The design (study) and delivery of a sampling system for airborne radioactive material from the stack at BR2. The assignment consists of: a fixed part; Design( study) and a contingent part (purchasing, delivery and installation). Although the conclusion of the contract covers the entire contract, it binds the contracting authority only for the fixed portions. The execution of the conditional part is subject to a decision of the contracting authority communicated to the contractor (Article 57 of the Law of June 17, 2016),), after approval of Phase 1, confirmation of the budget within the requested implementation period, and provided that the study has been approved by BEL-V. . In the absence of such approval, the conditional part shall not be executed. The installation and validation will t
Machine translation for guidance. The official summary remains authoritative.
Official summary · Nederlands
The design (study) and delivery of a sampling system for airborne radioactive material from the stack at BR2. The assignment consists of: a fixed part; Design( study) and a contingent part (purchasing, delivery and installation). Although the conclusion of the contract covers the entire contract, it binds the contracting authority only for the fixed portions. The execution of the conditional part is subject to a decision of the contracting authority communicated to the contractor (Article 57 of the Law of June 17, 2016),), after approval of Phase 1, confirmation of the budget within the requested implementation period, and provided that the study has been approved by BEL-V. . In the absence of such approval, the conditional part shall not be executed. The installation and validation will t
Preparation checklist
Prepare my response
Checks to carry out in the official documents. This guide is not an automated document analysis.
- Read the complete documents and amendments
- Check participation conditions and required documents
- Check whether a site visit or meeting is required
- Review award criteria and their weighting
- Check available resources, budget and schedule
- Confirm the submission process and deadline
TED · 605182-2026. Checked on Sep 4, 2026, 11:05 AM.
https://ted.europa.eu/nl/notice/-/detail/605182-2026
Analyse this notice with AI
Summary, requirements and deadlines based on the information in this notice. The tender documents are not read.
Sign in to analyseNotice and PDF analyses use the same allowance.
Notice history
Procurement timeline
Follow the main stages and updates linked to this procurement procedure.
No other related notice has been identified yet.
Data is restructured for easier reading. The official notice and procurement documents always prevail.
Source and reliability
TED · 605182-2026. Checked on Sep 4, 2026, 11:05 AM.
Data is restructured for easier reading. The official notice and procurement documents always prevail.