Resumen oficial · Nederlands
¿Qué se contrata?
The design (study) and delivery of a sampling system for airborne radioactive material from the stack at BR2. The assignment consists of: a fixed part; Design( study) and a contingent part (purchasing, delivery and installation). Although the conclusion of the contract covers the entire contract, it binds the contracting authority only for the fixed portions. The execution of the conditional part is subject to a decision of the contracting authority communicated to the contractor (Article 57 of the Law of June 17, 2016),), after approval of Phase 1, confirmation of the budget within the requested implementation period, and provided that the study has been approved by BEL-V. . In the absence of such approval, the conditional part shall not be executed.…
Traducción automática orientativa. El resumen oficial sigue siendo la referencia.
Resumen oficial · Nederlands
The design (study) and delivery of a sampling system for airborne radioactive material from the stack at BR2. The assignment consists of: a fixed part; Design( study) and a contingent part (purchasing, delivery and installation). Although the conclusion of the contract covers the entire contract, it binds the contracting authority only for the fixed portions. The execution of the conditional part is subject to a decision of the contracting authority communicated to the contractor (Article 57 of the Law of June 17, 2016),), after approval of Phase 1, confirmation of the budget within the requested implementation period, and provided that the study has been approved by BEL-V. . In the absence of such approval, the conditional part shall not be executed.…
Historial del anuncio
Cronología del procedimiento de contratación
Sigue las principales etapas y actualizaciones vinculadas a este procedimiento de contratación.
Los datos se reestructuran para facilitar su lectura. El anuncio oficial y los documentos de contratación siempre prevalecen.
Fuente y fiabilidad
TED · 605182-2026. Verificado el 4 sept. 2026 11:05.
Los datos se reestructuran para facilitar su lectura. El anuncio oficial y los documentos de contratación siempre prevalecen.