Analyse this notice with AI
Summary, requirements and deadlines based on the information in this notice. The tender documents are not read.
Sign in to analyseNotice and PDF analyses use the same allowance.
Official summary
What is being procured?
This project involves the construction of Lot 4 which mainly entails 1.5kms of greenway in the Mountelliott townsland, north of New Ross. This is part of the South East Greenway and includes the following works; • Rehabilitation works to the Red Bridge, including removal of existing tracks and decking, repair works where specified, installation of new Greenway deck system, lighting, fencing and guarding etc. • Earthworks to the existing embankment between the Red Bridge and Mount Elliott Lane. • Rehabilitation works within Mount Elliott Tunnel. • Construction of a new bridge structure spanning Mount Elliott Lane with piled foundation supports. • Construction of ramped access to the North of the Mount Elliott tunnel from the Greenway corridor to the R700. • Construct the Greenway Lot 4 Sect
Preparation checklist
Prepare my response
Checks to carry out in the official documents. This guide is not an automated document analysis.
- Read the complete documents and amendments
- Check participation conditions and required documents
- Check whether a site visit or meeting is required
- Review award criteria and their weighting
- Check available resources, budget and schedule
- Confirm the submission process and deadline
TED · 602881-2026. Checked on Sep 4, 2026, 10:05 AM.
https://ted.europa.eu/en/notice/-/detail/602881-2026
Notice history
Procurement timeline
Follow the main stages and updates linked to this procurement procedure.
No other related notice has been identified yet.
Data is restructured for easier reading. The official notice and procurement documents always prevail.
Source and reliability
TED · 602881-2026. Checked on Sep 4, 2026, 10:05 AM.
Data is restructured for easier reading. The official notice and procurement documents always prevail.