Sommarju uffiċjali · English
X’qed jiġi akkwistat?
This project involves the construction of Lot 4 which mainly entails 1.5kms of greenway in the Mountelliott townsland, north of New Ross. This is part of the South East Greenway and includes the following works; • Rehabilitation works to the Red Bridge, including removal of existing tracks and decking, repair works where specified, installation of new Greenway deck system, lighting, fencing and guarding etc. • Earthworks to the existing embankment between the Red Bridge and Mount Elliott Lane. • Rehabilitation works within Mount Elliott Tunnel. • Construction of a new bridge structure spanning Mount Elliott Lane with piled foundation supports. • Construction of ramped access to the North of the Mount Elliott tunnel from the Greenway corridor to the R700. • Construct the Greenway Lot 4 Sect
Traduzzjoni awtomatika indikattiva. Is-sommarju uffiċjali jibqa’ r-referenza.
Sommarju uffiċjali · English
This project involves the construction of Lot 4 which mainly entails 1.5kms of greenway in the Mountelliott townsland, north of New Ross. This is part of the South East Greenway and includes the following works; • Rehabilitation works to the Red Bridge, including removal of existing tracks and decking, repair works where specified, installation of new Greenway deck system, lighting, fencing and guarding etc. • Earthworks to the existing embankment between the Red Bridge and Mount Elliott Lane. • Rehabilitation works within Mount Elliott Tunnel. • Construction of a new bridge structure spanning Mount Elliott Lane with piled foundation supports. • Construction of ramped access to the North of the Mount Elliott tunnel from the Greenway corridor to the R700. • Construct the Greenway Lot 4 Sect
Lista ta’ tħejjija
Ipprepara l-offerta tiegħi
Verifiki li jsiru fid-dokumenti uffiċjali. Din il-gwida mhijiex analiżi awtomatika tad-dokumenti.
- Aqra d-dokumenti kollha u l-emendi
- Iċċekkja l-kundizzjonijiet ta’ parteċipazzjoni u d-dokumenti mitluba
- Iċċekkja jekk hijiex meħtieġa żjara jew laqgħa
- Eżamina l-kriterji tal-għoti u l-piż tagħhom
- Iċċekkja r-riżorsi, il-baġit u l-iskeda disponibbli
- Ikkonferma l-proċedura u l-iskadenza tas-sottomissjoni
TED · 602881-2026. Iċċekkjat fil-04 Set 2026 10:05.
https://ted.europa.eu/en/notice/-/detail/602881-2026
Analizza dan l-avviż bl-AI
Sommarju, rekwiżiti u skadenzi bbażati fuq l-informazzjoni ta’ dan l-avviż. Id-dokumenti tas-sejħa għall-offerti ma jinqrawx.
Idħol biex tanalizzaL-analiżijiet tal-avviżi u tal-PDF jużaw l-istess kwota.
Storja tal-avviżi
Kronoloġija tal-akkwist
Segwi l-istadji ewlenin u l-aġġornamenti marbuta ma’ din il-proċedura ta’ akkwist.
S’issa ma ġie identifikat l-ebda avviż ieħor relatat.
Id-data hija ristrutturata biex tinqara aktar faċilment. L-avviż uffiċjali u d-dokumenti tal-akkwist dejjem jipprevalu.
Sors u affidabbiltà
TED · 602881-2026. Iċċekkjat fil-04 Set 2026 10:05.
Id-data hija ristrutturata biex tinqara aktar faċilment. L-avviż uffiċjali u d-dokumenti tal-akkwist dejjem jipprevalu.