Official summary
What is being procured?
The scope of this procurement procedure is the design, manufacturing, assembly, factory acceptance testing, transport and delivery of the Helium Refrigeration System (HRS) for the Isotope Separation System (ISS) within the Tritium Plant at ITER, based on Reversed Turbo-Brayton technology. The HRS will supply a cooling net power of approximately 1500 W at 18.5 K for the ISS of the ITER Tritium Plant. Optional scope: Option 1: factory performance testing; Option 2: technical assistance for on-site installation and final connection activities; Option 3: technical assistance for commissioning and site acceptance testing. Before the final call for tender, F4E may decide to remove certain options from the scope.
Preparation checklist
Prepare my response
Checks to carry out in the official documents. This guide is not an automated document analysis.
- Read the complete documents and amendments
- Check participation conditions and required documents
- Check whether a site visit or meeting is required
- Review award criteria and their weighting
- Check available resources, budget and schedule
- Confirm the submission process and deadline
TED · 601126-2026. Checked on Sep 4, 2026, 6:05 AM.
https://ted.europa.eu/en/notice/-/detail/601126-2026
Analyse this notice with AI
Summary, requirements and deadlines based on the information in this notice. The tender documents are not read.
Sign in to analyseNotice and PDF analyses use the same allowance.
Notice history
Procurement timeline
Follow the main stages and updates linked to this procurement procedure.
No other related notice has been identified yet.
Data is restructured for easier reading. The official notice and procurement documents always prevail.
Source and reliability
TED · 601126-2026. Checked on Sep 4, 2026, 6:05 AM.
Data is restructured for easier reading. The official notice and procurement documents always prevail.