Sommarju uffiċjali · English
X’qed jiġi akkwistat?
The scope of this procurement procedure is the design, manufacturing, assembly, factory acceptance testing, transport and delivery of the Helium Refrigeration System (HRS) for the Isotope Separation System (ISS) within the Tritium Plant at ITER, based on Reversed Turbo-Brayton technology. The HRS will supply a cooling net power of approximately 1500 W at 18.5 K for the ISS of the ITER Tritium Plant. Optional scope: Option 1: factory performance testing; Option 2: technical assistance for on-site installation and final connection activities; Option 3: technical assistance for commissioning and site acceptance testing. Before the final call for tender, F4E may decide to remove certain options from the scope.
Traduzzjoni awtomatika indikattiva. Is-sommarju uffiċjali jibqa’ r-referenza.
Sommarju uffiċjali · English
The scope of this procurement procedure is the design, manufacturing, assembly, factory acceptance testing, transport and delivery of the Helium Refrigeration System (HRS) for the Isotope Separation System (ISS) within the Tritium Plant at ITER, based on Reversed Turbo-Brayton technology. The HRS will supply a cooling net power of approximately 1500 W at 18.5 K for the ISS of the ITER Tritium Plant. Optional scope: Option 1: factory performance testing; Option 2: technical assistance for on-site installation and final connection activities; Option 3: technical assistance for commissioning and site acceptance testing. Before the final call for tender, F4E may decide to remove certain options from the scope.
Ħieles
Irċievi s-sejħiet li jmiss f’dan is-settur
Irċievi email kull ġimgħa b’avviżi ġodda li jaqblu mal-kriterji tiegħek. Iċċekkja jew aġġusta l-kriterji qabel tattiva t-twissija bla ħlas.
Lista ta’ tħejjija
Ipprepara l-offerta tiegħi
Verifiki li jsiru fid-dokumenti uffiċjali. Din il-gwida mhijiex analiżi awtomatika tad-dokumenti.
- Aqra d-dokumenti kollha u l-emendi
- Iċċekkja l-kundizzjonijiet ta’ parteċipazzjoni u d-dokumenti mitluba
- Iċċekkja jekk hijiex meħtieġa żjara jew laqgħa
- Eżamina l-kriterji tal-għoti u l-piż tagħhom
- Iċċekkja r-riżorsi, il-baġit u l-iskeda disponibbli
- Ikkonferma l-proċedura u l-iskadenza tas-sottomissjoni
TED · 601126-2026. Iċċekkjat fil-04 Set 2026 06:05.
https://ted.europa.eu/en/notice/-/detail/601126-2026
Analizza dan l-avviż bl-AI
Ifhem l-essenzjal: sommarju, skadenzi u punti x’tiċċekkja, abbażi tal-informazzjoni disponibbli.
L-analiżijiet tal-avviżi u tal-PDF jużaw l-istess kwota.
Storja tal-avviżi
Kronoloġija tal-akkwist
Segwi l-istadji ewlenin u l-aġġornamenti marbuta ma’ din il-proċedura ta’ akkwist.
S’issa ma ġie identifikat l-ebda avviż ieħor relatat.
Id-data hija ristrutturata biex tinqara aktar faċilment. L-avviż uffiċjali u d-dokumenti tal-akkwist dejjem jipprevalu.
Sors u affidabbiltà
TED · 601126-2026. Iċċekkjat fil-04 Set 2026 06:05.
Id-data hija ristrutturata biex tinqara aktar faċilment. L-avviż uffiċjali u d-dokumenti tal-akkwist dejjem jipprevalu.