Official summary
What is being procured?
The procurement entails the design, manufacturing, delivery, installation, and commissioning of a Proton Exchange Membrane (PEM) electrolysis system for hydrogen production at the JRC Ispra site. The core of the system is a 50 Nm3/h electrolyser (which must be upgradable to 100 Nm3/h) that delivers hydrogen at an outlet pressure of 30 barg. The main equipment will be delivered in a containerized/skid version divided into three specific areas: a control panel area with the AC/DC converter, a water purification unit, and an ATEXclassified area containing the stacks and gas purification treatment.…
Notice history
Procurement timeline
Follow the main stages and updates linked to this procurement procedure.
Data is restructured for easier reading. The official notice and procurement documents always prevail.
Source and reliability
TED · 583730-2026. Checked on Aug 27, 2026, 11:05 AM.
Data is restructured for easier reading. The official notice and procurement documents always prevail.