Superseded TED · Source

A more recent publication is available.
Correction notice · TED 662795-2026 ·

View notice on Tenderiva

Italy · Industrial machinery

Official title · English

Supply, Installation and maintenance of a PEM Electrolyser for Hydrogen Production at JRC Ispra

European Commission, DG JRC - Joint Research Centre · Italy

View notices under this name
Official summary

The procurement entails the design, manufacturing, delivery, installation, and commissioning of a Proton Exchange Membrane (PEM) electrolysis system for hydrogen production at the JRC Ispra site. The core of the system is a 50 Nm3/h electrolyser (which must be upgradable to 100 Nm3/h) that delivers hydrogen at an outlet pressure of 30 barg. The main equipment will be delivered in a containerized/skid version divided into three specific areas: a control…

What is being procured?
Deadline Oct 1, 2026 16:00 UTC+02:00
Estimated value1,100,000 EUR
PublishedAug 24, 2026
Open official notice ↗

Official summary

What is being procured?

The procurement entails the design, manufacturing, delivery, installation, and commissioning of a Proton Exchange Membrane (PEM) electrolysis system for hydrogen production at the JRC Ispra site. The core of the system is a 50 Nm3/h electrolyser (which must be upgradable to 100 Nm3/h) that delivers hydrogen at an outlet pressure of 30 barg. The main equipment will be delivered in a containerized/skid version divided into three specific areas: a control panel area with the AC/DC converter, a water purification unit, and an ATEX­classified area containing the stacks and gas purification treatment.…

Notice history

Procurement timeline

Follow the main stages and updates linked to this procurement procedure.

  1. Competition notice Notice being viewed

    · TED 583730-2026

    Open official notice ↗
  2. Correction notice

    · TED 649876-2026

    View notice on Tenderiva

    Open official notice ↗
  3. Correction notice

    · TED 662795-2026

    View notice on Tenderiva

    Open official notice ↗

Data is restructured for easier reading. The official notice and procurement documents always prevail.

Source and reliability

TED · 583730-2026. Checked on Aug 27, 2026, 11:05 AM.

Data is restructured for easier reading. The official notice and procurement documents always prevail.

Report an error by email