Offizielle Zusammenfassung · English
Was wird beschafft?
The procurement entails the design, manufacturing, delivery, installation, and commissioning of a Proton Exchange Membrane (PEM) electrolysis system for hydrogen production at the JRC Ispra site. The core of the system is a 50 Nm3/h electrolyser (which must be upgradable to 100 Nm3/h) that delivers hydrogen at an outlet pressure of 30 barg. The main equipment will be delivered in a containerized/skid version divided into three specific areas: a control panel area with the AC/DC converter, a water purification unit, and an ATEXclassified area containing the stacks and gas purification treatment. In addition to the containerized unit, the scope of supply includes several external components: An MV/LV transformer A thermal management system (dry cooler) A lowpressure hydrogen storage
Quelle und Verlässlichkeit
Quelle: amtliche TED-Bekanntmachung 583730-2026, zuletzt geprüft am 24.08.2026, 05:05. Maßgeblich bleibt die Originalveröffentlichung.
Die Daten werden für eine leichtere Lesbarkeit neu strukturiert. Maßgeblich sind stets die amtliche Bekanntmachung und die Vergabeunterlagen.