Open Source

Ireland · Architectural, construction, engineering and inspection services

Official subject · English

Celbridge Hazelhatch Mobility Corridor (Phase 5 to 7)

Kildare County Council_385 · Ireland

Deadline Aug 25, 2026, 3:00 PM UTC
Estimated value300,000 EUR
PublishedJul 22, 2026
Open official notice ↗

Official summary

What is being procured?

Detailed Design, Construction Administration and Project Handover of all scheme works, as approved or modified by An Coimisiún Pleanála. Approximately 2.0 km of new single carriageway mobility corridor extending from the R403 Clane Road to the R405 Hazelhatch Road, incorporating high quality active travel provision throughout. A new 66m long clear span bridge crossing of the River Liffey, designed in accordance with relevant Eurocodes and OPW requirements, with no in stream works required. Segregated footpaths and cycle facilities provided along the full length of the route, including: 2.0m wide one way cycle tracks and 2.0 m wide footpaths on both sides of the carriageway for the majority of the corridor; and a 3.0 m wide two way cycle track and footpath on constrained sections approachin

Source and reliability

Source: official TED notice 508338-2026, last checked Aug 21, 2026, 5:05 PM. The original publication remains authoritative.

Data is restructured for easier reading. The official notice and procurement documents always prevail.