A lehetőség összefoglalása
Mi a beszerzés tárgya?
Detailed Design, Construction Administration and Project Handover of all scheme works, as approved or modified by An Coimisiún Pleanála. Approximately 2.0 km of new single carriageway mobility corridor extending from the R403 Clane Road to the R405 Hazelhatch Road, incorporating high quality active travel provision throughout. A new 66m long clear span bridge crossing of the River Liffey, designed in accordance with relevant Eurocodes and OPW requirements, with no in stream works required. Segregated footpaths and cycle facilities provided along the full length of the route, including: 2.0m wide one way cycle tracks and 2.0 m wide footpaths on both sides of the carriageway for the majority of the corridor; and a 3.0 m wide two way cycle track and footpath on constrained sections approachin
Forrás és megbízhatóság
Forrás: hivatalos TED-hirdetmény, 508338-2026. Utoljára ellenőrizve: 2026. aug. 21. 17:05. Az eredeti közzététel marad az irányadó.
Az adatokat a könnyebb olvashatóság érdekében átrendezzük. Mindig a hivatalos hirdetmény és a közbeszerzési dokumentumok az irányadók.