Official summary · Français
What is being procured?
The design (study) and delivery of a sampling system for airborne radioactive material from the stack at BR2. The assignment consists of: a fixed part; Design( study) and a contingent part (purchasing, delivery and installation). Although the conclusion of the contract covers the entire contract, it binds the contracting authority only for the fixed portions. The execution of the conditional part is subject to a decision of the contracting authority communicated to the contractor (Article 57 of the Law of June 17, 2016),), after approval of stage 1 and after the budgetary confirmation within the requested execution timeframe. The installation and validation will take place under the supervision of SCK CEN. A quote for the maintenance should be provided and is considered as an permitted opt
Machine translation for guidance. The official summary remains authoritative.
Official summary · Français
The design (study) and delivery of a sampling system for airborne radioactive material from the stack at BR2. The assignment consists of: a fixed part; Design( study) and a contingent part (purchasing, delivery and installation). Although the conclusion of the contract covers the entire contract, it binds the contracting authority only for the fixed portions. The execution of the conditional part is subject to a decision of the contracting authority communicated to the contractor (Article 57 of the Law of June 17, 2016),), after approval of stage 1 and after the budgetary confirmation within the requested execution timeframe. The installation and validation will take place under the supervision of SCK CEN. A quote for the maintenance should be provided and is considered as an permitted opt
Notice history
Procurement timeline
Follow the main stages and updates linked to this procurement procedure.
No other related notice has been identified yet.
Data is restructured for easier reading. The official notice and procurement documents always prevail.
Source and reliability
TED · 431514-2026. Checked on Aug 23, 2026, 6:05 AM.
Data is restructured for easier reading. The official notice and procurement documents always prevail.