Résumé officiel
Quel est l’objet du marché ?
The design (study) and delivery of a sampling system for airborne radioactive material from the stack at BR2. The assignment consists of: a fixed part; Design( study) and a contingent part (purchasing, delivery and installation). Although the conclusion of the contract covers the entire contract, it binds the contracting authority only for the fixed portions. The execution of the conditional part is subject to a decision of the contracting authority communicated to the contractor (Article 57 of the Law of June 17, 2016),), after approval of stage 1 and after the budgetary confirmation within the requested execution timeframe. The installation and validation will take place under the supervision of SCK CEN. A quote for the maintenance should be provided and is considered as an permitted opt
Historique de l’avis
Chronologie de la procédure
Suivez les principales étapes et mises à jour liées à cette procédure de passation.
Aucun autre avis lié n’a encore été identifié.
Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.
Source et fiabilité
TED · 431514-2026. Vérifié le 23 août 2026 à 06:05.
Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.