Officiell sammanfattning · English
Vad upphandlas?
Tipperary County Council has identified the need to engage the services of an Engineering Consultancy led, single point, multi-disciplinary design team to advance the preliminary design, detailed design, statutory planning requirements, enabling and procurement to progress the Lisbunny Link Road Scheme, including carrying out the duties of PSDP, along with the procurement of other services, surveys and investigations as required to advance the scheme. The subject of this brief is located on the outskirts of Nenagh town centre within the Municipal District of Nenagh, County Tipperary. The scheme is located between the R445 Dublin Road to the south and the L1211 Old Birr Road to the north. It incorporates a new extension of the existing L5146 Lisbunny Industrial Park road to join the L1211.
Vägledande maskinöversättning. Den officiella sammanfattningen gäller.
Officiell sammanfattning · English
Tipperary County Council has identified the need to engage the services of an Engineering Consultancy led, single point, multi-disciplinary design team to advance the preliminary design, detailed design, statutory planning requirements, enabling and procurement to progress the Lisbunny Link Road Scheme, including carrying out the duties of PSDP, along with the procurement of other services, surveys and investigations as required to advance the scheme. The subject of this brief is located on the outskirts of Nenagh town centre within the Municipal District of Nenagh, County Tipperary. The scheme is located between the R445 Dublin Road to the south and the L1211 Old Birr Road to the north. It incorporates a new extension of the existing L5146 Lisbunny Industrial Park road to join the L1211.
Förberedelselista
Förbered mitt anbud
Kontroller att göra i de officiella handlingarna. Guiden är ingen automatisk dokumentanalys.
- Läs alla handlingar och ändringar
- Kontrollera deltagarvillkor och begärda dokument
- Kontrollera om platsbesök eller möte krävs
- Granska tilldelningskriterier och viktning
- Kontrollera tillgängliga resurser, budget och tidsplan
- Bekräfta inlämningsförfarandet och tidsfristen
TED · 643594-2026. Kontrollerad 18 sep. 2026 11:05.
https://ted.europa.eu/en/notice/-/detail/643594-2026
Analysera denna annons med AI
Sammanfattning, krav och tidsfrister utifrån informationen i denna annons. Upphandlingsdokumenten läses inte.
Logga in för att analyseraAnalyser av annonser och PDF-filer använder samma kvot.
Meddelandehistorik
Tidslinje för upphandlingsförfarandet
Följ de viktigaste stegen och uppdateringarna som är kopplade till det här upphandlingsförfarandet.
Uppgifterna har strukturerats om för att bli lättare att läsa. Det officiella meddelandet och upphandlingsdokumenten gäller alltid.
Källa och tillförlitlighet
TED · 643594-2026. Kontrollerad 18 sep. 2026 11:05.
Uppgifterna har strukturerats om för att bli lättare att läsa. Det officiella meddelandet och upphandlingsdokumenten gäller alltid.