Officielt resumé · English
Hvad indkøbes?
Tipperary County Council has identified the need to engage the services of an Engineering Consultancy led, single point, multi-disciplinary design team to advance the preliminary design, detailed design, statutory planning requirements, enabling and procurement to progress the Lisbunny Link Road Scheme, including carrying out the duties of PSDP, along with the procurement of other services, surveys and investigations as required to advance the scheme. The subject of this brief is located on the outskirts of Nenagh town centre within the Municipal District of Nenagh, County Tipperary. The scheme is located between the R445 Dublin Road to the south and the L1211 Old Birr Road to the north. It incorporates a new extension of the existing L5146 Lisbunny Industrial Park road to join the L1211.
Vejledende maskinoversættelse. Det officielle resumé er fortsat gældende.
Officielt resumé · English
Tipperary County Council has identified the need to engage the services of an Engineering Consultancy led, single point, multi-disciplinary design team to advance the preliminary design, detailed design, statutory planning requirements, enabling and procurement to progress the Lisbunny Link Road Scheme, including carrying out the duties of PSDP, along with the procurement of other services, surveys and investigations as required to advance the scheme. The subject of this brief is located on the outskirts of Nenagh town centre within the Municipal District of Nenagh, County Tipperary. The scheme is located between the R445 Dublin Road to the south and the L1211 Old Birr Road to the north. It incorporates a new extension of the existing L5146 Lisbunny Industrial Park road to join the L1211.
Forberedelsesliste
Forbered mit tilbud
Kontroller i de officielle dokumenter. Denne vejledning er ikke en automatisk dokumentanalyse.
- Læs alle dokumenter og ændringer
- Kontrollér deltagelsesbetingelser og krævede dokumenter
- Kontrollér om besøg eller møde er påkrævet
- Gennemgå tildelingskriterier og vægtning
- Kontrollér tilgængelige ressourcer, budget og tidsplan
- Bekræft indsendelsesprocedure og frist
TED · 643594-2026. Kontrolleret 18. sep. 2026 11.05.
https://ted.europa.eu/en/notice/-/detail/643594-2026
Analysér denne bekendtgørelse med AI
Resumé, krav og frister ud fra oplysningerne i denne bekendtgørelse. Udbudsmaterialet bliver ikke læst.
Log ind for at analysereAnalyser af bekendtgørelser og PDF’er bruger samme kvote.
Meddelelseshistorik
Udbudsforløb
Følg de vigtigste faser og opdateringer i dette udbud.
Data er omstruktureret for at være lettere at læse. Den officielle meddelelse og udbudsdokumenterne er altid gældende.
Kilde og pålidelighed
TED · 643594-2026. Kontrolleret 18. sep. 2026 11.05.
Data er omstruktureret for at være lettere at læse. Den officielle meddelelse og udbudsdokumenterne er altid gældende.