Ametlik kokkuvõte · English
Mida hangitakse?
Tipperary County Council has identified the need to engage the services of an Engineering Consultancy led, single point, multi-disciplinary design team to advance the preliminary design, detailed design, statutory planning requirements, enabling and procurement to progress the Lisbunny Link Road Scheme, including carrying out the duties of PSDP, along with the procurement of other services, surveys and investigations as required to advance the scheme. The subject of this brief is located on the outskirts of Nenagh town centre within the Municipal District of Nenagh, County Tipperary. The scheme is located between the R445 Dublin Road to the south and the L1211 Old Birr Road to the north. It incorporates a new extension of the existing L5146 Lisbunny Industrial Park road to join the L1211.
Abistav masintõlge. Ametlik kokkuvõte jääb määravaks.
Ametlik kokkuvõte · English
Tipperary County Council has identified the need to engage the services of an Engineering Consultancy led, single point, multi-disciplinary design team to advance the preliminary design, detailed design, statutory planning requirements, enabling and procurement to progress the Lisbunny Link Road Scheme, including carrying out the duties of PSDP, along with the procurement of other services, surveys and investigations as required to advance the scheme. The subject of this brief is located on the outskirts of Nenagh town centre within the Municipal District of Nenagh, County Tipperary. The scheme is located between the R445 Dublin Road to the south and the L1211 Old Birr Road to the north. It incorporates a new extension of the existing L5146 Lisbunny Industrial Park road to join the L1211.
Ettevalmistuse loend
Valmista minu pakkumus ette
Ametlikest dokumentidest kontrollitavad punktid. Juhend ei ole automaatne dokumendianalüüs.
- Loe kõiki dokumente ja muudatusi
- Kontrolli osalemistingimusi ja nõutud dokumente
- Kontrolli kas nõutakse külastust või koosolekut
- Vaata hindamiskriteeriume ja nende osakaale
- Kontrolli ressursse, eelarvet ja ajakava
- Kinnita esitamise kord ja tähtaeg
TED · 643594-2026. Kontrollitud 18. sept 2026 11:05.
https://ted.europa.eu/en/notice/-/detail/643594-2026
Analüüsi seda teadet tehisintellektiga
Kokkuvõte, nõuded ja tähtajad selle teate teabe põhjal. Hankedokumente ei loeta.
Analüüsimiseks logi sisseTeadete ja PDF-ide analüüsid kasutavad sama kvooti.
Teate ajalugu
Hankemenetluse ajajoon
Jälgige selle hankemenetlusega seotud põhietappe ja uuendusi.
Andmed on lihtsamaks lugemiseks ümber struktureeritud. Alati on ülimuslikud ametlik teade ja hankedokumendid.
Allikas ja usaldusväärsus
TED · 643594-2026. Kontrollitud 18. sept 2026 11:05.
Andmed on lihtsamaks lugemiseks ümber struktureeritud. Alati on ülimuslikud ametlik teade ja hankedokumendid.