Službeni sažetak · English
Što se nabavlja?
Tipperary County Council has identified the need to engage the services of an Engineering Consultancy led, single point, multi-disciplinary design team to advance the preliminary design, detailed design, statutory planning requirements, enabling and procurement to progress the Lisbunny Link Road Scheme, including carrying out the duties of PSDP, along with the procurement of other services, surveys and investigations as required to advance the scheme. The subject of this brief is located on the outskirts of Nenagh town centre within the Municipal District of Nenagh, County Tipperary. The scheme is located between the R445 Dublin Road to the south and the L1211 Old Birr Road to the north. It incorporates a new extension of the existing L5146 Lisbunny Industrial Park road to join the L1211.
Strojni prijevod za lakše razumijevanje. Službeni sažetak ostaje mjerodavan.
Službeni sažetak · English
Tipperary County Council has identified the need to engage the services of an Engineering Consultancy led, single point, multi-disciplinary design team to advance the preliminary design, detailed design, statutory planning requirements, enabling and procurement to progress the Lisbunny Link Road Scheme, including carrying out the duties of PSDP, along with the procurement of other services, surveys and investigations as required to advance the scheme. The subject of this brief is located on the outskirts of Nenagh town centre within the Municipal District of Nenagh, County Tipperary. The scheme is located between the R445 Dublin Road to the south and the L1211 Old Birr Road to the north. It incorporates a new extension of the existing L5146 Lisbunny Industrial Park road to join the L1211.
Popis za pripremu
Pripremi moju ponudu
Točke za provjeru u službenoj dokumentaciji. Ovaj vodič nije automatska analiza dokumentacije.
- Pročitati sve dokumente i izmjene
- Provjeriti uvjete sudjelovanja i tražene dokumente
- Provjeriti je li potreban obilazak ili sastanak
- Pregledati kriterije dodjele i njihove pondere
- Provjeriti raspoložive resurse, proračun i raspored
- Potvrditi postupak i rok predaje
TED · 643594-2026. Provjereno 18. ruj 2026. 11:05.
https://ted.europa.eu/en/notice/-/detail/643594-2026
Analiziraj ovu objavu uz AI
Sažetak, zahtjevi i rokovi na temelju informacija iz ove objave. Dokumentacija o nabavi ne čita se.
Prijavite se za analizuAnalize objava i PDF-ova koriste istu kvotu.
Povijest obavijesti
Vremenski slijed postupka nabave
Pratite glavne faze i izmjene povezane s ovim postupkom nabave.
Podaci su preuređeni radi lakšeg čitanja. Službena obavijest i dokumentacija uvijek imaju prednost.
Izvor i pouzdanost
TED · 643594-2026. Provjereno 18. ruj 2026. 11:05.
Podaci su preuređeni radi lakšeg čitanja. Službena obavijest i dokumentacija uvijek imaju prednost.