Stängd TED · Källa · Språk: English

Norge · Byggnadskonstruktioner, material och hjälpprodukter

Officiell titel · English

BA-26-023-GK Project reserve water Gjøvik-Biri ENT1B Raw water pump station

Gjøvik Kommune · Norge

Visa annonser under detta namn
Tidsfrist Ej angivet
Uppskattat värde95 000 000 NOK
Publicerat30 juni 2026
Öppna officiellt meddelande ↗

Officiell sammanfattning · English

Vad upphandlas?

Gjøvik municipality is responsible for ensuring a safe and stable delivery of drinking water to the inhabitants of the municipality. In order to strengthen security of supply, it has been decided to establish a full-fledged back-up water system that can supply both Biri and Gjøvik. Stage 1 of the project included the establishment of an submarine pipeline from Gjøvik to Redalen, the construction of a pressure increase station, as well as establishing a connection point for continuing the pipeline towards Biri. The sea pipeline was lowered in Mjøsa in autumn 2020, and after completion of the pump station the facility was put into operation in 2021. In stage 2 the pipeline shall be continued from Redalen to Biri, where both a raw water pump station and a new water treatment plant shall be es

Meddelandehistorik

Tidslinje för upphandlingsförfarandet

Följ de viktigaste stegen och uppdateringarna som är kopplade till det här upphandlingsförfarandet.

  1. Upphandlingsannons

    · TED 382098-2026

    Öppna officiellt meddelande ↗
  2. Resultatmeddelande Aktuellt meddelande

    · TED 447485-2026

    Öppna officiellt meddelande ↗

Uppgifterna har strukturerats om för att bli lättare att läsa. Det officiella meddelandet och upphandlingsdokumenten gäller alltid.

Källa och tillförlitlighet

TED · 447485-2026. Kontrollerad 23 aug. 2026 09:05.

Uppgifterna har strukturerats om för att bli lättare att läsa. Det officiella meddelandet och upphandlingsdokumenten gäller alltid.

Rapportera ett fel via e-post