Magħluq TED · Sors · Lingwa: English

in-Norveġja · Strutturi, materjali u prodotti awżiljarji tal-kostruzzjoni

Titlu uffiċjali · English

BA-26-023-GK Project reserve water Gjøvik-Biri ENT1B Raw water pump station

Gjøvik Kommune · in-Norveġja

Ara avviżi taħt dan l-isem
Skadenza Mhux imħabbar
Valur stmat95,000,000 NOK
Ippubblikat30 Ġun 2026
Iftaħ l-avviż uffiċjali ↗

Sommarju uffiċjali · English

X’qed jiġi akkwistat?

Gjøvik municipality is responsible for ensuring a safe and stable delivery of drinking water to the inhabitants of the municipality. In order to strengthen security of supply, it has been decided to establish a full-fledged back-up water system that can supply both Biri and Gjøvik. Stage 1 of the project included the establishment of an submarine pipeline from Gjøvik to Redalen, the construction of a pressure increase station, as well as establishing a connection point for continuing the pipeline towards Biri. The sea pipeline was lowered in Mjøsa in autumn 2020, and after completion of the pump station the facility was put into operation in 2021. In stage 2 the pipeline shall be continued from Redalen to Biri, where both a raw water pump station and a new water treatment plant shall be es

Storja tal-avviżi

Kronoloġija tal-akkwist

Segwi l-istadji ewlenin u l-aġġornamenti marbuta ma’ din il-proċedura ta’ akkwist.

  1. Avviż ta’ kompetizzjoni

    · TED 382098-2026

    Iftaħ l-avviż uffiċjali ↗
  2. Avviż tar-riżultat Avviż attwali

    · TED 447485-2026

    Iftaħ l-avviż uffiċjali ↗

Id-data hija ristrutturata biex tinqara aktar faċilment. L-avviż uffiċjali u d-dokumenti tal-akkwist dejjem jipprevalu.

Sors u affidabbiltà

TED · 447485-2026. Iċċekkjat fil-23 Aww 2026 09:05.

Id-data hija ristrutturata biex tinqara aktar faċilment. L-avviż uffiċjali u d-dokumenti tal-akkwist dejjem jipprevalu.

Irrapporta żball bl-email