Dúnta TED · Foinse · Teanga: English

an Iorua · Struchtúir, ábhair agus táirgí cúnta tógála

Teideal oifigiúil · English

BA-26-023-GK Project reserve water Gjøvik-Biri ENT1B Raw water pump station

Gjøvik Kommune · an Iorua

Féach ar fhógraí faoin ainm seo
Spriocdháta Gan fógairt
Luach measta95,000,000 NOK
Foilsithe30 Meith 2026
Oscail an fógra oifigiúil ↗

Achoimre oifigiúil · English

Cad atá á sholáthar?

Gjøvik municipality is responsible for ensuring a safe and stable delivery of drinking water to the inhabitants of the municipality. In order to strengthen security of supply, it has been decided to establish a full-fledged back-up water system that can supply both Biri and Gjøvik. Stage 1 of the project included the establishment of an submarine pipeline from Gjøvik to Redalen, the construction of a pressure increase station, as well as establishing a connection point for continuing the pipeline towards Biri. The sea pipeline was lowered in Mjøsa in autumn 2020, and after completion of the pump station the facility was put into operation in 2021. In stage 2 the pipeline shall be continued from Redalen to Biri, where both a raw water pump station and a new water treatment plant shall be es

Stair na bhfógraí

Amlíne an tsoláthair

Lean na príomhchéimeanna agus na nuashonruithe a bhaineann leis an nós imeachta soláthair seo.

  1. Fógra comórtais

    · TED 382098-2026

    Oscail an fógra oifigiúil ↗
  2. Fógra toraidh Fógra reatha

    · TED 447485-2026

    Oscail an fógra oifigiúil ↗

Tá na sonraí athstruchtúrtha chun iad a léamh níos éasca. Is iad an fógra oifigiúil agus na doiciméid soláthair a bhíonn i réim i gcónaí.

Foinse agus iontaofacht

TED · 447485-2026. Seiceáilte ar 23 Lún 2026 09:05.

Tá na sonraí athstruchtúrtha chun iad a léamh níos éasca. Is iad an fógra oifigiúil agus na doiciméid soláthair a bhíonn i réim i gcónaí.

Tuairiscigh earráid trí ríomhphost