Clos TED · Source · Langue: English

Norvège · Structures, matériaux et produits auxiliaires de construction

Titre officiel · English

BA-26-023-GK Project reserve water Gjøvik-Biri ENT1B Raw water pump station

Gjøvik Kommune · Norvège

Voir les avis sous ce nom
Échéance Non communiqué
Valeur estimée95 000 000 NOK
Publié30 juin 2026
Ouvrir l’avis officiel ↗

Résumé officiel · English

Quel est l’objet du marché ?

Gjøvik municipality is responsible for ensuring a safe and stable delivery of drinking water to the inhabitants of the municipality. In order to strengthen security of supply, it has been decided to establish a full-fledged back-up water system that can supply both Biri and Gjøvik. Stage 1 of the project included the establishment of an submarine pipeline from Gjøvik to Redalen, the construction of a pressure increase station, as well as establishing a connection point for continuing the pipeline towards Biri. The sea pipeline was lowered in Mjøsa in autumn 2020, and after completion of the pump station the facility was put into operation in 2021. In stage 2 the pipeline shall be continued from Redalen to Biri, where both a raw water pump station and a new water treatment plant shall be es

Historique de l’avis

Chronologie de la procédure

Suivez les principales étapes et mises à jour liées à cette procédure de passation.

  1. Avis de mise en concurrence

    · TED 382098-2026

    Ouvrir l’avis officiel ↗
  2. Avis d’attribution Avis actuel

    · TED 447485-2026

    Ouvrir l’avis officiel ↗

Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.

Source et fiabilité

TED · 447485-2026. Vérifié le 23 août 2026 à 09:05.

Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.

Signaler une erreur par e-mail