Officiell sammanfattning · English
Vad upphandlas?
This project involves the upgrade of a 4km route along the R132 Dundalk Inner Relief Road starting at the junction with the R215 Dublin Road and finishing at Táin Bridge. The upgrades involve the provision of segregated cycle tracks, widened footpaths, upgrade of major junctions along the route, pedestrian and cycling crossings at identified desire lines and the provision of all other ancillary works associated with these cycle tracks along the length of the scheme.
Vägledande maskinöversättning. Den officiella sammanfattningen gäller.
Officiell sammanfattning · English
This project involves the upgrade of a 4km route along the R132 Dundalk Inner Relief Road starting at the junction with the R215 Dublin Road and finishing at Táin Bridge. The upgrades involve the provision of segregated cycle tracks, widened footpaths, upgrade of major junctions along the route, pedestrian and cycling crossings at identified desire lines and the provision of all other ancillary works associated with these cycle tracks along the length of the scheme.
Gratis
Få nästa upphandlingar inom denna bransch
Få ett veckovis mejl med nya meddelanden som matchar dina kriterier. Kontrollera eller justera kriterierna innan du aktiverar din kostnadsfria bevakning.
Meddelandehistorik
Tidslinje för upphandlingsförfarandet
Följ de viktigaste stegen och uppdateringarna som är kopplade till det här upphandlingsförfarandet.
Inget annat relaterat meddelande har ännu identifierats.
Uppgifterna har strukturerats om för att bli lättare att läsa. Det officiella meddelandet och upphandlingsdokumenten gäller alltid.
Källa och tillförlitlighet
TED · 330312-2026. Kontrollerad 22 aug. 2026 07:05.
Uppgifterna har strukturerats om för att bli lättare att läsa. Det officiella meddelandet och upphandlingsdokumenten gäller alltid.