Oficiālais kopsavilkums · English
Kas tiek iepirkts?
This project involves the upgrade of a 4km route along the R132 Dundalk Inner Relief Road starting at the junction with the R215 Dublin Road and finishing at Táin Bridge. The upgrades involve the provision of segregated cycle tracks, widened footpaths, upgrade of major junctions along the route, pedestrian and cycling crossings at identified desire lines and the provision of all other ancillary works associated with these cycle tracks along the length of the scheme.
Informatīvs mašīntulkojums. Oficiālais kopsavilkums joprojām ir noteicošais.
Oficiālais kopsavilkums · English
This project involves the upgrade of a 4km route along the R132 Dundalk Inner Relief Road starting at the junction with the R215 Dublin Road and finishing at Táin Bridge. The upgrades involve the provision of segregated cycle tracks, widened footpaths, upgrade of major junctions along the route, pedestrian and cycling crossings at identified desire lines and the provision of all other ancillary works associated with these cycle tracks along the length of the scheme.
Bezmaksas
Saņemiet nākamos šīs nozares iepirkumus
Reizi nedēļā saņemiet e-pastu ar jauniem paziņojumiem, kas atbilst jūsu kritērijiem. Pirms bezmaksas brīdinājuma aktivizēšanas pārbaudiet vai mainiet kritērijus.
Paziņojuma vēsture
Iepirkuma procedūras laika skala
Sekojiet galvenajiem posmiem un atjauninājumiem, kas saistīti ar šo iepirkuma procedūru.
Cits saistīts paziņojums vēl nav identificēts.
Dati ir pārstrukturēti vieglākai lasīšanai. Oficiālais paziņojums un iepirkuma dokumenti vienmēr ir noteicošie.
Avots un uzticamība
TED · 330312-2026. Pārbaudīts 2026. gada 22. aug. 07:05.
Dati ir pārstrukturēti vieglākai lasīšanai. Oficiālais paziņojums un iepirkuma dokumenti vienmēr ir noteicošie.