Résumé officiel · English
Quel est l’objet du marché ?
This project involves the upgrade of a 4km route along the R132 Dundalk Inner Relief Road starting at the junction with the R215 Dublin Road and finishing at Táin Bridge. The upgrades involve the provision of segregated cycle tracks, widened footpaths, upgrade of major junctions along the route, pedestrian and cycling crossings at identified desire lines and the provision of all other ancillary works associated with these cycle tracks along the length of the scheme.
Traduction automatique indicative. Le résumé officiel reste la référence.
Résumé officiel · English
This project involves the upgrade of a 4km route along the R132 Dundalk Inner Relief Road starting at the junction with the R215 Dublin Road and finishing at Táin Bridge. The upgrades involve the provision of segregated cycle tracks, widened footpaths, upgrade of major junctions along the route, pedestrian and cycling crossings at identified desire lines and the provision of all other ancillary works associated with these cycle tracks along the length of the scheme.
Gratuit
Recevez les prochains marchés de cette activité
Retrouvez les nouveaux avis correspondant à vos critères dans un e-mail hebdomadaire. Vérifiez ou ajustez les critères avant d’activer votre alerte gratuite.
Historique de l’avis
Chronologie de la procédure
Suivez les principales étapes et mises à jour liées à cette procédure de passation.
Aucun autre avis lié n’a encore été identifié.
Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.
Source et fiabilité
TED · 330312-2026. Vérifié le 22 août 2026 à 07:05.
Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.