Rezumat oficial · English
Ce se achiziționează?
This project involves the upgrade of a 4km route along the R132 Dundalk Inner Relief Road starting at the junction with the R215 Dublin Road and finishing at Táin Bridge. The upgrades involve the provision of segregated cycle tracks, widened footpaths, upgrade of major junctions along the route, pedestrian and cycling crossings at identified desire lines and the provision of all other ancillary works associated with these cycle tracks along the length of the scheme.
Traducere automată orientativă. Rezumatul oficial rămâne referința.
Rezumat oficial · English
This project involves the upgrade of a 4km route along the R132 Dundalk Inner Relief Road starting at the junction with the R215 Dublin Road and finishing at Táin Bridge. The upgrades involve the provision of segregated cycle tracks, widened footpaths, upgrade of major junctions along the route, pedestrian and cycling crossings at identified desire lines and the provision of all other ancillary works associated with these cycle tracks along the length of the scheme.
Gratuit
Primiți următoarele licitații din acest sector
Primiți săptămânal un e-mail cu anunțuri noi care corespund criteriilor dvs. Verificați sau ajustați criteriile înainte de a activa alerta gratuită.
Istoricul anunțului
Cronologia procedurii de achiziție
Urmăriți principalele etape și actualizări legate de această procedură de achiziție.
Nu a fost identificat încă niciun alt anunț asociat.
Datele sunt restructurate pentru o lectură mai ușoară. Anunțul oficial și documentele achiziției prevalează întotdeauna.
Sursă și fiabilitate
TED · 330312-2026. Verificat la 22 aug. 2026, 07:05.
Datele sunt restructurate pentru o lectură mai ușoară. Anunțul oficial și documentele achiziției prevalează întotdeauna.