Sommarju uffiċjali · English
X’qed jiġi akkwistat?
Refurbishment, Fit-out and Building Works to the Sidings Building. Named Project 26 this is the relocation project for EMP staff at OneDAC to The Sidings, Dublin 2. The Sidings Building is delivered to a CAT A landlord specification and a fitout works contractor is required to complete a fitout designed to meet the business needs. The contract duration will be Q2 2025 to end of Q2 2027 (including a 12mo Defect Liability Period post completion).
Traduzzjoni awtomatika indikattiva. Is-sommarju uffiċjali jibqa’ r-referenza.
Sommarju uffiċjali · English
Refurbishment, Fit-out and Building Works to the Sidings Building. Named Project 26 this is the relocation project for EMP staff at OneDAC to The Sidings, Dublin 2. The Sidings Building is delivered to a CAT A landlord specification and a fitout works contractor is required to complete a fitout designed to meet the business needs. The contract duration will be Q2 2025 to end of Q2 2027 (including a 12mo Defect Liability Period post completion).
Ħieles
Irċievi s-sejħiet li jmiss f’dan is-settur
Irċievi email kull ġimgħa b’avviżi ġodda li jaqblu mal-kriterji tiegħek. Iċċekkja jew aġġusta l-kriterji qabel tattiva t-twissija bla ħlas.
Storja tal-avviżi
Kronoloġija tal-akkwist
Segwi l-istadji ewlenin u l-aġġornamenti marbuta ma’ din il-proċedura ta’ akkwist.
S’issa ma ġie identifikat l-ebda avviż ieħor relatat.
Id-data hija ristrutturata biex tinqara aktar faċilment. L-avviż uffiċjali u d-dokumenti tal-akkwist dejjem jipprevalu.
Sors u affidabbiltà
TED · 620793-2026. Iċċekkjat fil-11 Set 2026 02:06.
Id-data hija ristrutturata biex tinqara aktar faċilment. L-avviż uffiċjali u d-dokumenti tal-akkwist dejjem jipprevalu.