Službeni sažetak · English
Što se nabavlja?
Refurbishment, Fit-out and Building Works to the Sidings Building. Named Project 26 this is the relocation project for EMP staff at OneDAC to The Sidings, Dublin 2. The Sidings Building is delivered to a CAT A landlord specification and a fitout works contractor is required to complete a fitout designed to meet the business needs. The contract duration will be Q2 2025 to end of Q2 2027 (including a 12mo Defect Liability Period post completion).
Strojni prijevod za lakše razumijevanje. Službeni sažetak ostaje mjerodavan.
Službeni sažetak · English
Refurbishment, Fit-out and Building Works to the Sidings Building. Named Project 26 this is the relocation project for EMP staff at OneDAC to The Sidings, Dublin 2. The Sidings Building is delivered to a CAT A landlord specification and a fitout works contractor is required to complete a fitout designed to meet the business needs. The contract duration will be Q2 2025 to end of Q2 2027 (including a 12mo Defect Liability Period post completion).
Povijest obavijesti
Vremenski slijed postupka nabave
Pratite glavne faze i izmjene povezane s ovim postupkom nabave.
Još nije pronađena nijedna druga povezana obavijest.
Podaci su preuređeni radi lakšeg čitanja. Službena obavijest i dokumentacija uvijek imaju prednost.
Izvor i pouzdanost
TED · 620793-2026. Provjereno 11. ruj 2026. 02:06.
Podaci su preuređeni radi lakšeg čitanja. Službena obavijest i dokumentacija uvijek imaju prednost.