Oficiální shrnutí · English
Co je předmětem zakázky?
Refurbishment, Fit-out and Building Works to the Sidings Building. Named Project 26 this is the relocation project for EMP staff at OneDAC to The Sidings, Dublin 2. The Sidings Building is delivered to a CAT A landlord specification and a fitout works contractor is required to complete a fitout designed to meet the business needs. The contract duration will be Q2 2025 to end of Q2 2027 (including a 12mo Defect Liability Period post completion).
Orientační strojový překlad. Rozhodující zůstává oficiální shrnutí.
Oficiální shrnutí · English
Refurbishment, Fit-out and Building Works to the Sidings Building. Named Project 26 this is the relocation project for EMP staff at OneDAC to The Sidings, Dublin 2. The Sidings Building is delivered to a CAT A landlord specification and a fitout works contractor is required to complete a fitout designed to meet the business needs. The contract duration will be Q2 2025 to end of Q2 2027 (including a 12mo Defect Liability Period post completion).
Zdarma
Získejte další zakázky v tomto oboru
Každý týden obdržíte e-mail s novými oznámeními odpovídajícími vašim kritériím. Před aktivací bezplatného upozornění kritéria zkontrolujte nebo upravte.
Historie oznámení
Časová osa zadávacího řízení
Sledujte hlavní fáze a aktualizace spojené s tímto zadávacím řízením.
Dosud nebylo nalezeno žádné další související oznámení.
Data jsou upravena pro snazší čtení. Oficiální oznámení a zadávací dokumentace mají vždy přednost.
Zdroj a spolehlivost
TED · 620793-2026. Ověřeno 11. 9. 2026 2:06.
Data jsou upravena pro snazší čtení. Oficiální oznámení a zadávací dokumentace mají vždy přednost.