Achoimre oifigiúil · English
Cad atá á sholáthar?
Refurbishment, Fit-out and Building Works to the Sidings Building. Named Project 26 this is the relocation project for EMP staff at OneDAC to The Sidings, Dublin 2. The Sidings Building is delivered to a CAT A landlord specification and a fitout works contractor is required to complete a fitout designed to meet the business needs. The contract duration will be Q2 2025 to end of Q2 2027 (including a 12mo Defect Liability Period post completion).
Meaisínaistriúchán mar threoir. Is í an achoimre oifigiúil an tagairt údarásach.
Achoimre oifigiúil · English
Refurbishment, Fit-out and Building Works to the Sidings Building. Named Project 26 this is the relocation project for EMP staff at OneDAC to The Sidings, Dublin 2. The Sidings Building is delivered to a CAT A landlord specification and a fitout works contractor is required to complete a fitout designed to meet the business needs. The contract duration will be Q2 2025 to end of Q2 2027 (including a 12mo Defect Liability Period post completion).
Stair na bhfógraí
Amlíne an tsoláthair
Lean na príomhchéimeanna agus na nuashonruithe a bhaineann leis an nós imeachta soláthair seo.
Níor sainaithníodh aon fhógra gaolmhar eile go fóill.
Tá na sonraí athstruchtúrtha chun iad a léamh níos éasca. Is iad an fógra oifigiúil agus na doiciméid soláthair a bhíonn i réim i gcónaí.
Foinse agus iontaofacht
TED · 620793-2026. Seiceáilte ar 11 MFómh 2026 02:06.
Tá na sonraí athstruchtúrtha chun iad a léamh níos éasca. Is iad an fógra oifigiúil agus na doiciméid soláthair a bhíonn i réim i gcónaí.