Atvērts Avots · Valoda: English

Horvātija · Būvdarbi

Oficiālais priekšmets · English

Construction of the public sewer system of Mrkopalj and Sunger; Rehabilitation of water supply pipelines

KD VODOVOD I KANALIZACIJA d. o. o. · Horvātija

Termiņš 2026. gada 1. sept. 07:30 UTC
Paredzamā vērtībaNav paziņots
Publicēts2026. gada 6. aug.
Atvērt oficiālo paziņojumu ↗

Oficiālais kopsavilkums · English

Kas tiek iepirkts?

Construction of the public sewer system of Mrkopalj and Sunger – Phase I and rehabilitation of water supply pipelines in the zone of construction of the Mrkopalj public sewer system - Phase I – the works include construction of sanitary sewers in the total length of 2,760.00 m, pressure sewers in the length of 435 m, with two pumping stations. In the zone of works, 3,157 m of water supply pipelines will also be replaced, with supporting shafts and fittings. This also includes the preparation of implementation designs, as-built survey, as-built reports and supporting documents required for the performance of works and issuance of Use Permits.

Avots un uzticamība

Avots: oficiālais TED paziņojums 544274-2026, pēdējā pārbaude 2026. gada 21. aug. 20:06. Noteicošā ir sākotnējā publikācija.

Dati ir pārstrukturēti vieglākai lasīšanai. Oficiālais paziņojums un iepirkuma dokumenti vienmēr ir noteicošie.