Отворена Източник · Език: English

Хърватия · Строителни работи

Официален предмет · English

Construction of the public sewer system of Mrkopalj and Sunger; Rehabilitation of water supply pipelines

KD VODOVOD I KANALIZACIJA d. o. o. · Хърватия

Краен срок 1.09.2026 г., 7:30 ч. UTC
Прогнозна стойностНе е обявено
Публикувано6.08.2026 г.
Отворете официалното обявление ↗

Официално резюме · English

Какво се възлага?

Construction of the public sewer system of Mrkopalj and Sunger – Phase I and rehabilitation of water supply pipelines in the zone of construction of the Mrkopalj public sewer system - Phase I – the works include construction of sanitary sewers in the total length of 2,760.00 m, pressure sewers in the length of 435 m, with two pumping stations. In the zone of works, 3,157 m of water supply pipelines will also be replaced, with supporting shafts and fittings. This also includes the preparation of implementation designs, as-built survey, as-built reports and supporting documents required for the performance of works and issuance of Use Permits.

Източник и надеждност

Източник: официално обявление в TED 544274-2026, последно проверено на 21.08.2026 г., 20:06 ч.. Оригиналната публикация остава меродавна.

Данните са преструктурирани за по-лесно четене. Официалното обявление и документите винаги имат предимство.