Åben Kilde · Sprog: English

Kroatien · Bygge- og anlægsarbejder

Officielt emne · English

Construction of the public sewer system of Mrkopalj and Sunger; Rehabilitation of water supply pipelines

KD VODOVOD I KANALIZACIJA d. o. o. · Kroatien

Frist 1. sep. 2026 07.30 UTC
Anslået værdiIkke oplyst
Offentliggjort6. aug. 2026
Åbn officiel meddelelse ↗

Officielt resumé · English

Hvad indkøbes?

Construction of the public sewer system of Mrkopalj and Sunger – Phase I and rehabilitation of water supply pipelines in the zone of construction of the Mrkopalj public sewer system - Phase I – the works include construction of sanitary sewers in the total length of 2,760.00 m, pressure sewers in the length of 435 m, with two pumping stations. In the zone of works, 3,157 m of water supply pipelines will also be replaced, with supporting shafts and fittings. This also includes the preparation of implementation designs, as-built survey, as-built reports and supporting documents required for the performance of works and issuance of Use Permits.

Kilde og pålidelighed

Kilde: officiel TED-meddelelse 544274-2026, senest kontrolleret 21. aug. 2026 20.06. Den oprindelige offentliggørelse er fortsat gældende.

Data er omstruktureret for at være lettere at læse. Den officielle meddelelse og udbudsdokumenterne er altid gældende.