Nyitott Forrás · Nyelv: English

Horvátország · Építési munkák

Hivatalos tárgy · English

Construction of the public sewer system of Mrkopalj and Sunger; Rehabilitation of water supply pipelines

KD VODOVOD I KANALIZACIJA d. o. o. · Horvátország

Határidő 2026. szept. 1. 7:30 UTC
Becsült értékNincs megadva
Közzétéve2026. aug. 6.
Hivatalos hirdetmény megnyitása ↗

Hivatalos összefoglaló · English

Mi a beszerzés tárgya?

Construction of the public sewer system of Mrkopalj and Sunger – Phase I and rehabilitation of water supply pipelines in the zone of construction of the Mrkopalj public sewer system - Phase I – the works include construction of sanitary sewers in the total length of 2,760.00 m, pressure sewers in the length of 435 m, with two pumping stations. In the zone of works, 3,157 m of water supply pipelines will also be replaced, with supporting shafts and fittings. This also includes the preparation of implementation designs, as-built survey, as-built reports and supporting documents required for the performance of works and issuance of Use Permits.

Forrás és megbízhatóság

Forrás: hivatalos TED-hirdetmény, 544274-2026. Utoljára ellenőrizve: 2026. aug. 21. 20:06. Az eredeti közzététel marad az irányadó.

Az adatokat a könnyebb olvashatóság érdekében átrendezzük. Mindig a hivatalos hirdetmény és a közbeszerzési dokumentumok az irányadók.