Abierto Fuente · Idioma: English

Ucrania · Equipos de transporte y productos auxiliares

Objeto oficial · English

Supply of new low-floor multi-section articulated Tramways 26-27 metres length, including a set of main, wearing and consumable spare parts, a set of equipment and tools for maintenance and repair, and related services, up to a total budget of €7,790,412.00 (seven million seven hundred ninety thousand four hundred twelve euros), sales taxes and customs duties excluded

Municipal Company "Dnipro Electrotransport" · Ucrania

Plazo 15 oct. 2026 8:00 UTC
Valor estimado7.790.412 EUR
Publicado17 ago. 2026
Abrir el anuncio oficial ↗

Resumen oficial · English

¿Qué se contrata?

Supply of city articulated trams, mono-directional, one driving cab, equipped with three bogies taking into consideration the permissible axle load. 100% of the length of the passenger compartment must be low with free access without steps to all passenger doors from the stop platform. Number of sections: no more than three. The Tramway shall have the following outer dimensions: length: 26,000 mm to 27,000 mm; width: nominal 2,500 mm; height: maximum 3,500 mm (3,700 mm with current pantograph in down position); minimum curve radius: 20 meters in main line (maximum speed of 10 km/h); minimum standard curve radius: 18 meters in depot; wheel base: 1,800 mm – 1,900 mm; the distance from the axis of the track to the edge of platforms for passengers, located on the straight line of the track is

Fuente y fiabilidad

Fuente: anuncio oficial de TED 566777-2026, comprobado por última vez el 21 ago. 2026 21:05. La publicación original sigue siendo la referencia.

Los datos se reestructuran para facilitar su lectura. El anuncio oficial y los documentos de contratación siempre prevalecen.