Aberto Fonte · Idioma: English

Ucrânia · Equipamento de transporte e produtos auxiliares

Objeto oficial · English

Supply of new low-floor multi-section articulated Tramways 26-27 metres length, including a set of main, wearing and consumable spare parts, a set of equipment and tools for maintenance and repair, and related services, up to a total budget of €7,790,412.00 (seven million seven hundred ninety thousand four hundred twelve euros), sales taxes and customs duties excluded

Municipal Company "Dnipro Electrotransport" · Ucrânia

Prazo 15 de out de 2026 08:00 UTC
Valor estimado7 790 412 EUR
Publicado17 de ago de 2026
Abrir o anúncio oficial ↗

Resumo oficial · English

O que está a ser adquirido?

Supply of city articulated trams, mono-directional, one driving cab, equipped with three bogies taking into consideration the permissible axle load. 100% of the length of the passenger compartment must be low with free access without steps to all passenger doors from the stop platform. Number of sections: no more than three. The Tramway shall have the following outer dimensions: length: 26,000 mm to 27,000 mm; width: nominal 2,500 mm; height: maximum 3,500 mm (3,700 mm with current pantograph in down position); minimum curve radius: 20 meters in main line (maximum speed of 10 km/h); minimum standard curve radius: 18 meters in depot; wheel base: 1,800 mm – 1,900 mm; the distance from the axis of the track to the edge of platforms for passengers, located on the straight line of the track is

Fonte e fiabilidade

Fonte: anúncio oficial do TED 566777-2026, verificado pela última vez em 21 de ago de 2026 21:05. A publicação original continua a ser a referência.

Os dados são reorganizados para facilitar a leitura. O anúncio oficial e os documentos do concurso prevalecem sempre.