Miftuħ Sors · Lingwa: English

l-Ukrajna · Tagħmir tat-trasport u prodotti awżiljarji

Suġġett uffiċjali · English

Supply of new low-floor multi-section articulated Tramways 26-27 metres length, including a set of main, wearing and consumable spare parts, a set of equipment and tools for maintenance and repair, and related services, up to a total budget of €7,790,412.00 (seven million seven hundred ninety thousand four hundred twelve euros), sales taxes and customs duties excluded

Municipal Company "Dnipro Electrotransport" · l-Ukrajna

Skadenza 15 Ott 2026 08:00 UTC
Valur stmat7,790,412 EUR
Ippubblikat17 Aww 2026
Iftaħ l-avviż uffiċjali ↗

Sommarju uffiċjali · English

X’qed jiġi akkwistat?

Supply of city articulated trams, mono-directional, one driving cab, equipped with three bogies taking into consideration the permissible axle load. 100% of the length of the passenger compartment must be low with free access without steps to all passenger doors from the stop platform. Number of sections: no more than three. The Tramway shall have the following outer dimensions: length: 26,000 mm to 27,000 mm; width: nominal 2,500 mm; height: maximum 3,500 mm (3,700 mm with current pantograph in down position); minimum curve radius: 20 meters in main line (maximum speed of 10 km/h); minimum standard curve radius: 18 meters in depot; wheel base: 1,800 mm – 1,900 mm; the distance from the axis of the track to the edge of platforms for passengers, located on the straight line of the track is

Sors u affidabbiltà

Sors: avviż uffiċjali tat-TED 566777-2026, iċċekkjat l-aħħar fil-21 Aww 2026 21:05. Il-pubblikazzjoni oriġinali tibqa’ awtorevoli.

Id-data hija ristrutturata biex tinqara aktar faċilment. L-avviż uffiċjali u d-dokumenti tal-akkwist dejjem jipprevalu.