Resumen de la oportunidad
¿Qué se contrata?
The scope will include the complete lifecycle delivery of microwave radio point-to-point links and other link replacements and/or new links, including but not limited to survey and site readiness, design and engineering, planning/permits, health and safety management and statutory role appointments (including PSDP/PSCS where required), supply and logistics of equipment and materials, installation and integration, testing and commissioning, documentation and handover, and defect/aftercare support. The Contractor(s) will be responsible for coordinating all necessary resources, subcontractors, plant hire and specialist access requirements (including working at height), and for delivering each work package to agreed programme, quality and safety requirements, from initiation through to final h
Fuente y fiabilidad
Fuente: anuncio oficial de TED 503672-2026, comprobado por última vez el 21 ago. 2026 15:05. La publicación original sigue siendo la referencia.
Los datos se reestructuran para facilitar su lectura. El anuncio oficial y los documentos de contratación siempre prevalecen.