Sintesi dell’opportunità
Che cosa viene acquistato?
The scope will include the complete lifecycle delivery of microwave radio point-to-point links and other link replacements and/or new links, including but not limited to survey and site readiness, design and engineering, planning/permits, health and safety management and statutory role appointments (including PSDP/PSCS where required), supply and logistics of equipment and materials, installation and integration, testing and commissioning, documentation and handover, and defect/aftercare support. The Contractor(s) will be responsible for coordinating all necessary resources, subcontractors, plant hire and specialist access requirements (including working at height), and for delivering each work package to agreed programme, quality and safety requirements, from initiation through to final h
Fonte e affidabilità
Fonte: avviso TED ufficiale 503672-2026, verificato l’ultima volta il 21 ago 2026, 15:05. La pubblicazione originale resta il riferimento.
I dati sono riorganizzati per agevolarne la lettura. L’avviso ufficiale e i documenti di gara prevalgono sempre.