Sommarju tal-opportunità
X’qed jiġi akkwistat?
The scope will include the complete lifecycle delivery of microwave radio point-to-point links and other link replacements and/or new links, including but not limited to survey and site readiness, design and engineering, planning/permits, health and safety management and statutory role appointments (including PSDP/PSCS where required), supply and logistics of equipment and materials, installation and integration, testing and commissioning, documentation and handover, and defect/aftercare support. The Contractor(s) will be responsible for coordinating all necessary resources, subcontractors, plant hire and specialist access requirements (including working at height), and for delivering each work package to agreed programme, quality and safety requirements, from initiation through to final h
Sors u affidabbiltà
Sors: avviż uffiċjali tat-TED 503672-2026, iċċekkjat l-aħħar fil-21 Aww 2026 15:05. Il-pubblikazzjoni oriġinali tibqa’ awtorevoli.
Id-data hija ristrutturata biex tinqara aktar faċilment. L-avviż uffiċjali u d-dokumenti tal-akkwist dejjem jipprevalu.