Resumen de la oportunidad
¿Qué se contrata?
The framework agreement shall ensure the Regulation Authority for Energy (RME) access to consultancy services in connection with inspections and control of participants in the power industry and involved parties. The framework agreement will primarily be used for inspections and controls of the schemes for electricity subsidy and the Norgespris. The framework agreement is not limited to these schemes and it will also be able to cover similar assignments within concurrent thematics, including inspections and controls that are within RME ́s authority. The framework agreement can also include minor assignments where the contractor provides RME assistance with the execution of individual assignments within similar inspection and control processes, for example assistance with data acquisition,
Fuente y fiabilidad
Fuente: anuncio oficial de TED 467393-2026, comprobado por última vez el 20 ago. 2026 21:05. La publicación original sigue siendo la referencia.
Los datos se reestructuran para facilitar su lectura. El anuncio oficial y los documentos de contratación siempre prevalecen.