Ametlik kokkuvõte · English
Mida hangitakse?
The framework agreement shall ensure the Regulation Authority for Energy (RME) access to consultancy services in connection with inspections and control of participants in the power industry and involved parties. The framework agreement will primarily be used for inspections and controls of the schemes for electricity subsidy and the Norgespris. The framework agreement is not limited to these schemes and it will also be able to cover similar assignments within concurrent thematics, including inspections and controls that are within RME ́s authority. The framework agreement can also include minor assignments where the contractor provides RME assistance with the execution of individual assignments within similar inspection and control processes, for example assistance with data acquisition,
Allikas ja usaldusväärsus
Allikas: ametlik TEDi teade 467393-2026, viimati kontrollitud 20. aug 2026 21:05. Määravaks jääb algne väljaanne.
Andmed on lihtsamaks lugemiseks ümber struktureeritud. Alati on ülimuslikud ametlik teade ja hankedokumendid.