Resumo da oportunidade
O que está a ser adquirido?
The framework agreement shall ensure the Regulation Authority for Energy (RME) access to consultancy services in connection with inspections and control of participants in the power industry and involved parties. The framework agreement will primarily be used for inspections and controls of the schemes for electricity subsidy and the Norgespris. The framework agreement is not limited to these schemes and it will also be able to cover similar assignments within concurrent thematics, including inspections and controls that are within RME ́s authority. The framework agreement can also include minor assignments where the contractor provides RME assistance with the execution of individual assignments within similar inspection and control processes, for example assistance with data acquisition,
Fonte e fiabilidade
Fonte: anúncio oficial do TED 467393-2026, verificado pela última vez em 20 de ago de 2026 21:05. A publicação original continua a ser a referência.
Os dados são reorganizados para facilitar a leitura. O anúncio oficial e os documentos do concurso prevalecem sempre.