Cerrado TED · Fuente · Idioma: English

Noruega · Trabajos de construcción

Título oficial · English

E64 Machine and process 3 – The transfer plant (Konghaugen reindeer treatment plant) - Qualification phase

Ålesund kommune · Noruega

Ver anuncios con este nombre
Plazo No indicado
Valor estimadoNo indicado
Publicado12 jun. 2026
Abrir el anuncio oficial ↗

Resumen oficial · English

¿Qué se contrata?

Ålesund municipality and Sula municipality cooperate through the project "BLÅ – fjords for the future", to construct a new sewage treatment plant at Kongshaugen (Kvasnes) in Sula municipality. The aims in the project are as follows: Cleaner fjord systemLovlig system for sewage waterBærekraftig system for the futureIt new sewage treatment facility shall be built in rock and have sufficient treatment capacity to handle sewage water that shall be supplied from Sula municipality and Ålesund municipality. The facility is dimensioned for 69,000 person equivalents and it shall be designed as a secondary treatment facility. The new treatment facility shall replace seven existing treatment plants and some interceptors for sludge. The sewage water must therefore be pumped from the existing treatment

Historial del anuncio

Cronología del procedimiento de contratación

Sigue las principales etapas y actualizaciones vinculadas a este procedimiento de contratación.

Todavía no se ha identificado ningún otro anuncio relacionado.

  1. Anuncio de adjudicación Anuncio actual

    · TED 403674-2026

    Abrir el anuncio oficial ↗

Los datos se reestructuran para facilitar su lectura. El anuncio oficial y los documentos de contratación siempre prevalecen.

Fuente y fiabilidad

TED · 403674-2026. Verificado el 22 ago. 2026 22:05.

Los datos se reestructuran para facilitar su lectura. El anuncio oficial y los documentos de contratación siempre prevalecen.

Informar de un error por correo electrónico