Magħluq TED · Sors · Lingwa: English

in-Norveġja · Xogħlijiet ta’ kostruzzjoni

Titlu uffiċjali · English

E64 Machine and process 3 – The transfer plant (Konghaugen reindeer treatment plant) - Qualification phase

Ålesund kommune · in-Norveġja

Ara avviżi taħt dan l-isem
Skadenza Mhux imħabbar
Valur stmatMhux imħabbar
Ippubblikat12 Ġun 2026
Iftaħ l-avviż uffiċjali ↗

Sommarju uffiċjali · English

X’qed jiġi akkwistat?

Ålesund municipality and Sula municipality cooperate through the project "BLÅ – fjords for the future", to construct a new sewage treatment plant at Kongshaugen (Kvasnes) in Sula municipality. The aims in the project are as follows: Cleaner fjord systemLovlig system for sewage waterBærekraftig system for the futureIt new sewage treatment facility shall be built in rock and have sufficient treatment capacity to handle sewage water that shall be supplied from Sula municipality and Ålesund municipality. The facility is dimensioned for 69,000 person equivalents and it shall be designed as a secondary treatment facility. The new treatment facility shall replace seven existing treatment plants and some interceptors for sludge. The sewage water must therefore be pumped from the existing treatment

Storja tal-avviżi

Kronoloġija tal-akkwist

Segwi l-istadji ewlenin u l-aġġornamenti marbuta ma’ din il-proċedura ta’ akkwist.

S’issa ma ġie identifikat l-ebda avviż ieħor relatat.

  1. Avviż tar-riżultat Avviż attwali

    · TED 403674-2026

    Iftaħ l-avviż uffiċjali ↗

Id-data hija ristrutturata biex tinqara aktar faċilment. L-avviż uffiċjali u d-dokumenti tal-akkwist dejjem jipprevalu.

Sors u affidabbiltà

TED · 403674-2026. Iċċekkjat fil-22 Aww 2026 22:05.

Id-data hija ristrutturata biex tinqara aktar faċilment. L-avviż uffiċjali u d-dokumenti tal-akkwist dejjem jipprevalu.

Irrapporta żball bl-email