Vad upphandlas?

Ålesund municipality and Sula municipality cooperate through the project "BLÅ – fjords for the future", to construct a new sewage treatment plant at Kongshaugen (Kvasnes) in Sula municipality. The aims in the project are as follows: Cleaner fjord systemLovlig system for sewage waterBærekraftig system for the futureIt new sewage treatment facility shall be built in rock and have sufficient treatment capacity to handle sewage water that shall be supplied from Sula municipality and Ålesund municipality. The facility is dimensioned for 69,000 person equivalents and it shall be designed as a secondary treatment facility. The new treatment facility shall replace seven existing treatment plants and some interceptors for sludge. The sewage water must therefore be pumped from the existing treatment

Meddelandehistorik

Tidslinje för upphandlingsförfarandet

Följ de viktigaste stegen och uppdateringarna som är kopplade till det här upphandlingsförfarandet.

Inget annat relaterat meddelande har ännu identifierats.

  1. Resultatmeddelande Aktuellt meddelande

    · TED 403674-2026

    Öppna officiellt meddelande ↗

Uppgifterna har strukturerats om för att bli lättare att läsa. Det officiella meddelandet och upphandlingsdokumenten gäller alltid.

Källa och tillförlitlighet

TED · 403674-2026. Kontrollerad 22 aug. 2026 22:05.

Uppgifterna har strukturerats om för att bli lättare att läsa. Det officiella meddelandet och upphandlingsdokumenten gäller alltid.

Rapportera ett fel via e-post