Official summary
What is being procured?
The contractor is required to initially visually inspect the buildings using their knowledge and experience, they need to check all external ventilation grilles and ventilation systems that form part of the fire damper overall system, and satisfy themselves as to what might be needed. Prior to an annual service been conducted to maintain the dampers in situ. Key requirements of the Project include: Survey of ventilation plant associated with fire dampers in each building, recording IDs and mark up each one. (Using self- adhesive stickers with ID Number, building, date test). Create an inventory of fire dampers in each building by location and type. Carry out testing of each damper or system to manufacturer’s instructions and to the appropriate British Standard BS9999:2017.…
Free
Get the next tenders in this sector
Receive new notices matching your criteria in a weekly email. Check or adjust your criteria before activating your free alert.
Preparation checklist
Prepare my response
Checks to carry out in the official documents. This guide is not an automated document analysis.
- Read the complete documents and amendments
- Check participation conditions and required documents
- Check whether a site visit or meeting is required
- Review award criteria and their weighting
- Check available resources, budget and schedule
- Confirm the submission process and deadline
Find a Tender · ocds-h6vhtk-077e38. Checked on Oct 1, 2026, 10:14 PM.
https://www.find-tender.service.gov.uk/procurement/ocds-h6vhtk-077e38
Analyse this notice with AI
AI analyses are available with Pro or Team.
Notice and PDF analyses use the same allowance.
Notice history
Procurement timeline
Follow the main stages and updates linked to this procurement procedure.
No other related notice has been identified yet.
Data is restructured for easier reading. The official notice and procurement documents always prevail.
Source and reliability
Find a Tender · ocds-h6vhtk-077e38. Checked on Oct 1, 2026, 10:14 PM.
Data is restructured for easier reading. The official notice and procurement documents always prevail.