Closing soon BOAMP · Source · Language: Français

France · Architectural, construction, engineering and inspection services

Official title · Français

Marché de maîtrise d'oeuvre pour la construction d'un ensemble de 3 bâtiments à usage artisanal et d'un parking à GELLAINVILLE (28)

SAEDEL · France

View notices under this name

Official summary · Français

What is being procured?

La présente consultation fait suite à une procédure préalable déclarée sans suite pour des motifs d'intérêt général, le besoin demeurant inchangé. Elle concerne l'exercice du rôle de maîtrise d'oeuvre pour la construction d'un ensemble de 3 bâtiments à usage artisanal et d'un parking à GELLAINVILLE (28) le long de la voie ferrée dans le Parc de l'Equerre.

Deadline Oct 22, 2026 12:00 · Time zone not specified
Estimated valueNot announced
PublishedOct 2, 2026
Official notice details Analyse this notice with AI Summary, requirements and deadlines based on the information in this notice. The tender documents are not read.
Open official notice ↗

BOAMP · Français

Official notice details

Open official notice ↗

Loading BOAMP information…

Preparation checklist

Prepare my response

Checks to carry out in the official documents. This guide is not an automated document analysis.

  1. Read the complete documents and amendments
  2. Check participation conditions and required documents
  3. Check whether a site visit or meeting is required
  4. Review award criteria and their weighting
  5. Check available resources, budget and schedule
  6. Confirm the submission process and deadline

BOAMP · 26-95276. Checked on Oct 3, 2026, 2:11 AM.
https://www.boamp.fr/pages/avis/?q=idweb:26-95276

Sign in →
Analyse PDF tender documents

Notice and PDF analyses use the same allowance.

Notice history

Procurement timeline

Follow the main stages and updates linked to this procurement procedure.

No other related notice has been identified yet.

  1. Competition notice Notice being viewed

    · BOAMP 26-95276

    Open official notice ↗

Data is restructured for easier reading. The official notice and procurement documents always prevail.

Source and reliability

BOAMP · 26-95276. Checked on Oct 3, 2026, 2:11 AM.

Data is restructured for easier reading. The official notice and procurement documents always prevail.

Report an error by email