Awarded TED · Source

Iceland · Repair and maintenance services

Official title · English

Maintenance of electric propulsion system

Fjársýsla ríkisins · Iceland

View notices under this name
Official summary

Preventive maintenance of the electric propulsion system of the research vessel Árni Friðriksson during the 2026. The procurement covers: Maintenance of the converters (SD7000), transformers, propulsion motors, and switchboard, together with associated spare parts (coin cell batteries, fan capacitors, earth brushes). The scope should include manpower, engineering, project and fleet management, mobilization/demobilization, travel and reporting. Specific…

What is being procured?
Deadline Not announced
Estimated valueNot announced
PublishedOct 21, 2026
Open official notice ↗

Official summary

What is being procured?

Preventive maintenance of the electric propulsion system of the research vessel Árni Friðriksson during the 2026. The procurement covers: Maintenance of the converters (SD7000), transformers, propulsion motors, and switchboard, together with associated spare parts (coin cell batteries, fan capacitors, earth brushes). The scope should include manpower, engineering, project and fleet management, mobilization/demobilization, travel and reporting. Specific maintenance tasks for 2026, including firmware upgrade of Hirschmann RS20 switches to the latest release, converter measurement and protection checks, transformer SFRA tests, switchboard protection relay tests by injection, converter fibre optical cable intensity checks, dry transformer torque tightening, bearing inspections of…

Notice history

Procurement timeline

Follow the main stages and updates linked to this procurement procedure.

No other related notice has been identified yet.

  1. Result notice Notice being viewed

    · TED 728860-2026

    Open official notice ↗

Data is restructured for easier reading. The official notice and procurement documents always prevail.

Source and reliability

TED · 728860-2026. Checked on Oct 21, 2026, 11:05 AM.

Data is restructured for easier reading. The official notice and procurement documents always prevail.

Report an error by email