Official summary
What is being procured?
Donegal County Council proposes to upgrade the section of the existing R232 that crosses Lough Ultan River at Glenmore approx. 4.7km West of Pettigo. The proposed road will provide an improved alignment and cross section. The project will include: a) A new concrete extension to the existing masonry bridge crossing the Lough Ultan River on the realigned R232. b) The realignment of approximately 0.7km of road infrastructure and cross-sectional improvements. Works will include, but are not limited to, the following: - Earthworks including excavation and filling and the disposal of surplus material; - Overhead telecom service diversion; - Drainage works; - Pavement construction; - Works on and adjacent to live carriageways along a narrow and winding alignment; - Works adjacent to woodland; -…
Free
Get the next tenders in this sector
Receive new notices matching your criteria in a weekly email. Check or adjust your criteria before activating your free alert.
Preparation checklist
Prepare my response
Checks to carry out in the official documents. This guide is not an automated document analysis.
- Read the complete documents and amendments
- Check participation conditions and required documents
- Check whether a site visit or meeting is required
- Review award criteria and their weighting
- Check available resources, budget and schedule
- Confirm the submission process and deadline
TED · 728291-2026. Checked on Oct 21, 2026, 3:05 AM.
https://ted.europa.eu/en/notice/-/detail/728291-2026
Analyse this notice with AI
AI analyses are available with Pro or Team.
Notice and PDF analyses use the same allowance.
Notice history
Procurement timeline
Follow the main stages and updates linked to this procurement procedure.
No other related notice has been identified yet.
Data is restructured for easier reading. The official notice and procurement documents always prevail.
Source and reliability
TED · 728291-2026. Checked on Oct 21, 2026, 3:05 AM.
Data is restructured for easier reading. The official notice and procurement documents always prevail.